Differences between revisions 5 and 6
Revision 5 as of 2023-04-28 13:10:18
Size: 1404
Comment:
Revision 6 as of 2023-04-28 13:11:41
Size: 1446
Comment:
Deletions are marked like this. Additions are marked like this.
Line 21: Line 21:
 * Oplev:  * Oplev: QPD centering will be necessary.
Line 23: Line 23:
 * Commissioning: Measurements of DAC noise.  * Commissioning: Measurements of DAC noise in BS/PR2.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/4/28 13:00-13:10

Participants: Takahashi, Mitsuhashi, Yokozawa, Akutsu, Tomaru, Ushiba, Uchiyama, Miyoki

Acceptance check document

Suspensions

  • Type-A: Investigation of the Oplev glitches in EY.
  • Type-B: Measurements on the sensor correction in SR2.
  • Type-Bp: Optimization of the damping control.
  • Type-C:

Other items

  • Oplev: QPD centering will be necessary.
  • ACC:
  • Commissioning: Measurements of DAC noise in BS/PR2.
  • Vacuum system:
  • Heater control:
  • TMS:

Discussion


VIS Meeting

Date: 2023/4/28 13:30-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

  • Measured the spectra and TFs of the PR2 suspension. Comparing the TFs with the mechanical models.

Type-C

Electronics

Control

R&D

Schedule

  • Type-A:
  • Type-B: Measurements in SRs.
  • Type-Bp: Damping control for BF damper.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 5/1

  • Sato: 5/3-4 (Safety shift)
  • Hirata: 5/6-8 (Safety shift)

Next meeting

  • 2023/5/12(FRI) 13:30-

KAGRA/Subgroups/VIS/VISMinutes20230428 (last edited 2023-04-28 13:46:00 by RyutaroTakahashi)