<> = Agenda/Minutes = [[https://zoom.us/j/203743987|Zoom Meeting]] ---------- = CRY+VIS Interface Meeting = Date: 2023/5/12 13:00-13:15 Participants: Takahashi, Mitsuhashi, Ikeda, Akutsu, Ushiba, Uchiyama, Miyoki, Sato, Hirata, Aso [[https://paper.dropbox.com/folder/show/AcceptanceTest-e.1gg8YzoPEhbTkrhvQwJ2zzo3dHVh5sJGieDgbm2n3h60mGqotBeE|Acceptance check document]] == Suspensions == * Type-A: Recovery from the EQ. TM local damping. Oplev QPD centering in EY. * Type-B: Recovery from the EQ. Measurements on the sensor correction in SR2. * Type-Bp: Recovery from the EQ. Optimization of the damping control in PR2. * Type-C: Recovery from the EQ. == Other items == * Oplev: QPD centering. * ACC: * Commissioning: Measurements of DAC noise. * Vacuum system: Connection of the vacuum gauge at X-27. * Heater control: * TMS: == Discussion == ---------- = VIS Meeting = Date: 2023/5/12 13:30-13:40 Participants: Takahashi, Fabian, Mitsuhashi, Ushiba, Uchiyama, Aso == Summary Report == === Type-A === === Type-B === * Takahashi-san tested sensor correction and blending filters designed by Terrence, for IP-L in SR2. The sensor correction worked well, but there was a problem in the design of the blending filters. Terrence has corrected the error and the measurement will be repeated again on Monday evening. === Type-Bp === * Optimization of the damping control in PR2. === Type-C === === Electronics === === Control === === R&D === == Schedule == * Sensor correction in SR2. * Offloading all suspensions on 5/16. * Final week for Fabian. == Safety == == Discussion == == Travel Plans == (Date in Kamioka) The week from 5/15 == Next meeting == * 2023/5/19(FRI) 13:30-