Differences between revisions 2 and 3
Revision 2 as of 2023-05-25 08:53:36
Size: 1044
Comment:
Revision 3 as of 2023-05-25 08:57:13
Size: 1154
Comment:
Deletions are marked like this. Additions are marked like this.
Line 52: Line 52:
 * If you submit your talk on the KAGRA VIS to the next JPS meeting in September, please let Takahashi know.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/5/26 13:00-

Participants:

Acceptance check document

Suspensions

  • Type-A:
  • Type-B:
  • Type-Bp:
  • Type-C:

Other items

  • Oplev:
  • ACC:
  • DGS: Measurements of DAC noise.
  • Vacuum system:
  • Heater control:
  • TMS:

Discussion


VIS Meeting

Date: 2023/5/26 13:30-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

Type-C

Electronics

Control

R&D

Schedule

  • O4a.

Safety

Discussion

  • VIS meeting will be held every two weeks on Friday.
  • Discussion on the plan of post-O4a will start the next time.
  • If you submit your talk on the KAGRA VIS to the next JPS meeting in September, please let Takahashi know.

Travel Plans

(Date in Kamioka)

The week from 5/29

Next meeting

  • 2023/6/9 10:00-

KAGRA/Subgroups/VIS/VISMinutes20230526 (last edited 2023-05-26 13:38:44 by RyutaroTakahashi)