<> = Agenda/Minutes = [[https://zoom.us/j/203743987|Zoom Meeting]] ---------- = CRY+VIS Interface Meeting = Date: 2023/6/16 13:00-13:30 Participants: Takahashi, Mitsuhashi, Yokozawa, Uchiyama, Aso, Miyoki, Ushiba, Kimura [[https://paper.dropbox.com/folder/show/AcceptanceTest-e.1gg8YzoPEhbTkrhvQwJ2zzo3dHVh5sJGieDgbm2n3h60mGqotBeE|Acceptance check document]] == Suspensions == * Type-A: * Type-B: * Type-Bp: * Type-C: == Other items == * Oplev: * ACC: * Commissioning: * Vacuum system: * Heater control: * TMS: == Post O4a == * Measurements of the DAC noise: Every Friday from 7/7. * Measurements on the sensor correction in SR2. * Optimization of the damping control in PRs: Concrete plan and schedule are necessary. * IP control with the ACCs. * In-vacuum accelerometer for IOO: PEM started the examination. The geophone will be installed into the OMC chamber. He gas should be enclosed in the pod. * Hight adjustments of Type-A in the cooling. * Measurement of the drum-head modes: 6/28 or 30. * Check of the length Oplev. * Noise budget of the cryo-payloads. * Temperature control for the Oplev: Preparing for the heater controller. * Check of the space in the IMM chamber: Ask Sato-san to check the drawings. == Discussion ==