Line 8: Line 8:
Date: 2023/6/23 13:00- Date: 2023/6/23 13:00-13:30
Line 10: Line 10:
Participants: Participants: Takahashi, Miyaki, Uchiyama, Mitsuhashi, Ikeda, Ushiba, Akutsu, Yokozawa, Aso
Line 16: Line 16:
 * Type-B:
 * Type-Bp:
 * Type-C
: Measurements of noise budget in PRM and BS.
 * Type-B: Measurements of noise budget in BS.
 * Type-Bp: Measurements of noise budget in PRM
* Type-C:
Line 32: Line 32:
 * IP control with the ACCs.  * IP control with the ACCs: After the CAL week.
Line 36: Line 36:
 * Check of the length Oplev.
 * Noise budget of the cryo-payloads.
 * Temperature control for the Oplev: Preparing for the heater controller.
 * Check of the length Oplev: At the time of the laser replacement.
 * Noise budget of the suspensions: PR2/3, Type-C, tower in the next time.
 * Temperature control for the Oplev: Preparing for the heater controller. Making the cables.
Line 47: Line 47:
Participants: Participants: Takahashi, Sato, Akutsu, Mitsuhashi, Tanaka, Ushiba, Aso
Line 51: Line 51:
 * Measured the noise budget in ETMY, ETMX, ITMX, and ITMY (GAS as well as cryo-payload).
Line 52: Line 54:
 * Measured the noise budget in BS.
Line 53: Line 57:
 * Measured the noise budget in PRM.
Line 57: Line 63:
 * Measured the resonant frequencies and the dependence in the center of gravity.
 * Transfer function in T-direction should be measured.
Line 67: Line 76:
  * Design of the blade damper.
  * Design of the flexible pendulum damper.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/6/23 13:00-13:30

Participants: Takahashi, Miyaki, Uchiyama, Mitsuhashi, Ikeda, Ushiba, Akutsu, Yokozawa, Aso

Acceptance check document

Suspensions

  • Type-A: Measurements of noise budget in ETMY, ETMX, ITMX, and ITMY.
  • Type-B: Measurements of noise budget in BS.
  • Type-Bp: Measurements of noise budget in PRM
  • Type-C:

Other items

  • Oplev:
  • ACC:
  • Commissioning:
  • Vacuum system:
  • Heater control:
  • TMS:

Post O4a

  • Measurements of the DAC noise: Every Friday from 7/7.
  • Measurements on the sensor correction in SR2: 1 night.
  • Optimization of the damping control in PRs: Measurements 2 days, Test 3 days.
  • IP control with the ACCs: After the CAL week.
  • In-vacuum accelerometer for IOO: Check the geophone pod on 6/27.
  • Hight adjustments of Type-A in the cooling.
  • Measurement of the drum-head modes: 6/28.
  • Check of the length Oplev: At the time of the laser replacement.
  • Noise budget of the suspensions: PR2/3, Type-C, tower in the next time.
  • Temperature control for the Oplev: Preparing for the heater controller. Making the cables.
  • Check of the space in the OMC/IMMT chamber: Sato-san made drawings for OMC.

Discussion


VIS Meeting

Date: 2023/6/23 10:00-11:00

Participants: Takahashi, Sato, Akutsu, Mitsuhashi, Tanaka, Ushiba, Aso

Summary Report

Type-A

  • Measured the noise budget in ETMY, ETMX, ITMX, and ITMY (GAS as well as cryo-payload).

Type-B

  • Measured the noise budget in BS.

Type-Bp

  • Measured the noise budget in PRM.

Type-C

Electronics

Control

R&D

  • Measured the resonant frequencies and the dependence in the center of gravity.
  • Transfer function in T-direction should be measured.

Toward O5

Schedule

  • Noise budget.

Safety

Discussion

  • Damping of the OMC suspension.
    • Design of the blade damper.
    • Design of the flexible pendulum damper.

Next meeting

  • 2023/7/7 10:00-

KAGRA/Subgroups/VIS/VISMinutes20230623 (last edited 2023-06-23 13:38:58 by RyutaroTakahashi)