Date: 2023/6/23 13:00- | Date: 2023/6/23 13:00-13:30 |
Line 10: | Line 10: |
Participants: | Participants: Takahashi, Miyaki, Uchiyama, Mitsuhashi, Ikeda, Ushiba, Akutsu, Yokozawa, Aso |
Line 16: | Line 16: |
* Type-B: * Type-Bp: * Type-C: Measurements of noise budget in PRM and BS. |
* Type-B: Measurements of noise budget in BS. * Type-Bp: Measurements of noise budget in PRM * Type-C: |
Line 32: | Line 32: |
* IP control with the ACCs. | * IP control with the ACCs: After the CAL week. |
Line 36: | Line 36: |
* Check of the length Oplev. * Noise budget of the cryo-payloads. * Temperature control for the Oplev: Preparing for the heater controller. |
* Check of the length Oplev: At the time of the laser replacement. * Noise budget of the suspensions: PR2/3, Type-C, tower in the next. * Temperature control for the Oplev: Preparing for the heater controller. Making the cables. |
Line 47: | Line 47: |
Participants: | Participants: Takahashi, Sato, Akutsu, Mitsuhashi, Tanaka, Ushiba, Aso |
Line 51: | Line 51: |
* Measured the noise budget in ETMY, ETMX, ITMX, and ITMY (GAS as well as cryo-payload). |
|
Line 52: | Line 54: |
* Measured the noise budget in BS. |
|
Line 53: | Line 57: |
* Measured the noise budget in PRM. |
|
Line 57: | Line 63: |
* Measured the resonant frequencies and the dependence in the center of gravity. * Transfer function in T-direction should be measured. |
|
Line 67: | Line 76: |
* Design of the blade damper. * Design of the flexible pendulum damper. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/6/23 13:00-13:30
Participants: Takahashi, Miyaki, Uchiyama, Mitsuhashi, Ikeda, Ushiba, Akutsu, Yokozawa, Aso
Suspensions
- Type-A: Measurements of noise budget in ETMY, ETMX, ITMX, and ITMY.
- Type-B: Measurements of noise budget in BS.
- Type-Bp: Measurements of noise budget in PRM
- Type-C:
Other items
- Oplev:
- ACC:
- Commissioning:
- Vacuum system:
- Heater control:
- TMS:
Post O4a
- Measurements of the DAC noise: Every Friday from 7/7.
- Measurements on the sensor correction in SR2: 1 night.
- Optimization of the damping control in PRs: Measurements 2 days, Test 3 days.
- IP control with the ACCs: After the CAL week.
- In-vacuum accelerometer for IOO: Check the geophone pod on 6/27.
- Hight adjustments of Type-A in the cooling.
- Measurement of the drum-head modes: 6/28.
- Check of the length Oplev: At the time of the laser replacement.
- Noise budget of the suspensions: PR2/3, Type-C, tower in the next.
- Temperature control for the Oplev: Preparing for the heater controller. Making the cables.
- Check of the space in the OMC/IMMT chamber: Sato-san made drawings for OMC.
Discussion
VIS Meeting
Date: 2023/6/23 10:00-11:00
Participants: Takahashi, Sato, Akutsu, Mitsuhashi, Tanaka, Ushiba, Aso
Summary Report
Type-A
- Measured the noise budget in ETMY, ETMX, ITMX, and ITMY (GAS as well as cryo-payload).
Type-B
- Measured the noise budget in BS.
Type-Bp
- Measured the noise budget in PRM.
Type-C
Electronics
Control
R&D
- Measured the resonant frequencies and the dependence in the center of gravity.
- Transfer function in T-direction should be measured.
Toward O5
Schedule
- Noise budget.
Safety
Discussion
- Damping of the OMC suspension.
- Design of the blade damper.
- Design of the flexible pendulum damper.
Next meeting
- 2023/7/7 10:00-