Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/6/30 13:00-

Participants:

Acceptance check document

Suspensions

  • Type-A: Measurements of noise budget.
  • Type-B: Measurements of noise budget in SR2, SR3.
  • Type-Bp: Measurements of noise budget in PR2, PR3
  • Type-C: Measurements of noise budget.

Other items

  • Oplev:
  • ACC:
  • Commissioning:
  • Vacuum system:
  • Heater control:
  • TMS:

Post O4a

  • Measurements of the DAC noise: Every Friday from 7/7.
  • Measurements on the sensor correction in SR2: 1 night.
  • Optimization of the damping control in PRs: Measurements 2 days, Test 3 days.
  • IP control with the ACCs: After the CAL week.
  • In-vacuum accelerometer for IOO: Checked the geophone pod on 6/27.
  • Hight adjustments of Type-A in the cooling.
  • Measurement of the drum-head modes: 6/28.
  • Check of the length Oplev: At the time of the laser replacement.
  • Noise budget of the suspensions: Ongoing.
  • Temperature control for the Oplev: Preparing for the heater controller.
  • Check of the space in the OMC/I FI chamber: Sato-san made the layout with the geophone pod in the IFI chamber.