Size: 2111
Comment:
|
Size: 2369
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 15: | Line 15: |
* Type-A: Test of the IP control with ACCs was postponed in IY. Offload of the GAS filters in IX. | * Type-A: Test of the IP control with ACCs was postponed in IY. Offloaded the GAS filters in IX on 7/3. |
Line 34: | Line 34: |
* Hight adjustments of Type-A in the cooling: Confirmation of the procedure. * Check of the length Oplev: Done except for IY. |
* Hight adjustments of Type-A in the cooling: Confirm [[https://paper.dropbox.com/doc/Hight-adjustment-in-cooling--B7ii3omB81JIm6khnBt_7fcaAQ-swWQ5h6M6lSs8yLp5D6dA|the procedure]]. * Check of the length Oplev: Finished except for IY. |
Line 43: | Line 43: |
Date: 2023/7/7 10:00- | Date: 2023/7/7 10:00-10:25 |
Line 45: | Line 45: |
Participants: | Participants: Takahashi, Mitsuhashi, Tanaka, Aso |
Line 61: | Line 61: |
=== Toward O5 === * [[https://paper.dropbox.com/doc/VIS-upgrade-toward-O5--B6qw57_1ZTHOEO_ZdAZi0hBjAQ-PJElGnRfe5jbNPeHWDHzi|Dropbox paper]] |
* Table-top experiment of the Roberts Linkage. * Measured the TF of each direction X/Y. Each resonant frequency was identified. |
Line 66: | Line 66: |
* Move the TAMA-SAS tower from the warehouse to the ATC lab in the week of 7/17. | * Move the TAMA-SAS tower from the warehouse to the ATC lab on 7/19. |
Line 68: | Line 68: |
== Safety == | == Toward O5 == * [[https://paper.dropbox.com/doc/VIS-upgrade-toward-O5--B6qw57_1ZTHOEO_ZdAZi0hBjAQ-PJElGnRfe5jbNPeHWDHzi|Dropbox paper]] |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/7/7 13:00-
Participants:
Suspensions
- Type-A: Test of the IP control with ACCs was postponed in IY. Offloaded the GAS filters in IX on 7/3.
- Type-B:
- Type-Bp:
- Type-C:
Other items
- Oplev: Check of the length Oplevs.
- ACC: Test of the IP control with ACCs in IY.
- Commissioning:
- Vacuum system:
- Heater control:
- TMS:
Post O4a
- Measurements of the DAC noise: Every Friday from 7/7.
- Measurements on the sensor correction in SR2: 1 night.
- Optimization of the damping control in PRs: Measurements 2 days, Test 3 days.
- IP control with the ACCs: Postponed the long-term test in IY.
- In-vacuum accelerometer for IOO: Install the geophone pod into the OMC chamber on 7/10.
Hight adjustments of Type-A in the cooling: Confirm the procedure.
- Check of the length Oplev: Finished except for IY.
- Noise budget of the suspensions: Finished except for the tower part.
- Temperature control for the Oplev: Preparing for the heater controller.
Discussion
VIS Meeting
Date: 2023/7/7 10:00-10:25
Participants: Takahashi, Mitsuhashi, Tanaka, Aso
Summary Report
Type-A
- Test of the IP control with ACCs was postponed in IY.
Type-B
Type-Bp
Type-C
- Damping of the OMC suspension.
- Design of the blade damper.
- Design of the flexible pendulum damper.
Electronics
Control
R&D
- Table-top experiment of the Roberts Linkage.
- Measured the TF of each direction X/Y. Each resonant frequency was identified.
Schedule
- Installation of the geophone pod into the OMC chamber on 7/10.
- Move the TAMA-SAS tower from the warehouse to the ATC lab on 7/19.
Toward O5
Discussion
Next meeting
- 2023/7/21 10:00-