Line 8: Line 8:
Date: 2023/7/7 13:00- Date: 2023/7/7 13:00-13:30
Line 10: Line 10:
Participants: Participants: Takahashi, Node, Akutsu, Uchiyama, Ikeda, Mitsuhashi, Kimura, Ushiba, Aso, Yokozawa
Line 15: Line 15:
 * Type-A: Test of the IP control with ACCs was postponed in IY. Offload of the GAS filters in IX.  * Type-A: Test of the IP control with ACCs was postponed in IY. Offloaded the GAS filters in IX on 7/3.
Line 21: Line 21:
 * Oplev: Check of the length Oplevs.  * Oplev: Check of the length Oplevs. QPD centering is necessary for PRs.
Line 24: Line 24:
 * Vacuum system:  * Vacuum system: Build the OMC chamber up to 1atm.
Line 31: Line 31:
 * Optimization of the damping control in PRs: Measurements 2 days, Test 3 days.  * Optimization of the damping control in PRs: Measurements 2 days, Test 3 days. Check the SUMCON model.
Line 34: Line 34:
 * Hight adjustments of Type-A in the cooling: Confirmation of the procedure.
 * Check of the length Oplev: Done except for IY.
 * Hight adjustments of Type-A in the cooling: Confirm [[https://paper.dropbox.com/doc/Hight-adjustment-in-cooling--B7ii3omB81JIm6khnBt_7fcaAQ-swWQ5h6M6lSs8yLp5D6dA|the procedure]].
 * Check of the length Oplev: Finished except for IY.
Line 43: Line 43:
Date: 2023/7/7 10:00- Date: 2023/7/7 10:00-10:25
Line 45: Line 45:
Participants: Participants: Takahashi, Mitsuhashi, Tanaka, Aso
Line 61: Line 61:
=== Toward O5 ===
 * [[https://paper.dropbox.com/doc/VIS-upgrade-toward-O5--B6qw57_1ZTHOEO_ZdAZi0hBjAQ-PJElGnRfe5jbNPeHWDHzi|Dropbox paper]]
 * Table-top experiment of the Roberts Linkage.
  * Measured the TF of each direction X/Y. Each resonant frequency was identified.
Line 66: Line 66:
 * Move the TAMA-SAS tower from the warehouse to the ATC lab in the week of 7/17.  * Move the TAMA-SAS tower from the warehouse to the ATC lab on 7/19.
Line 68: Line 68:
== Safety == == Toward O5 ==
 * [[https://paper.dropbox.com/doc/VIS-upgrade-toward-O5--B6qw57_1ZTHOEO_ZdAZi0hBjAQ-PJElGnRfe5jbNPeHWDHzi|Dropbox paper]]

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/7/7 13:00-13:30

Participants: Takahashi, Node, Akutsu, Uchiyama, Ikeda, Mitsuhashi, Kimura, Ushiba, Aso, Yokozawa

Acceptance check document

Suspensions

  • Type-A: Test of the IP control with ACCs was postponed in IY. Offloaded the GAS filters in IX on 7/3.
  • Type-B:
  • Type-Bp:
  • Type-C:

Other items

  • Oplev: Check of the length Oplevs. QPD centering is necessary for PRs.
  • ACC: Test of the IP control with ACCs in IY.
  • Commissioning:
  • Vacuum system: Build the OMC chamber up to 1atm.
  • Heater control:
  • TMS:

Post O4a

  • Measurements of the DAC noise: Every Friday from 7/7.
  • Measurements on the sensor correction in SR2: 1 night.
  • Optimization of the damping control in PRs: Measurements 2 days, Test 3 days. Check the SUMCON model.
  • IP control with the ACCs: Postponed the long-term test in IY.
  • In-vacuum accelerometer for IOO: Install the geophone pod into the OMC chamber on 7/10.
  • Hight adjustments of Type-A in the cooling: Confirm the procedure.

  • Check of the length Oplev: Finished except for IY.
  • Noise budget of the suspensions: Finished except for the tower part.
  • Temperature control for the Oplev: Preparing for the heater controller.

Discussion


VIS Meeting

Date: 2023/7/7 10:00-10:25

Participants: Takahashi, Mitsuhashi, Tanaka, Aso

Summary Report

Type-A

  • Test of the IP control with ACCs was postponed in IY.

Type-B

Type-Bp

Type-C

  • Damping of the OMC suspension.
    • Design of the blade damper.
    • Design of the flexible pendulum damper.

Electronics

Control

R&D

  • Table-top experiment of the Roberts Linkage.
    • Measured the TF of each direction X/Y. Each resonant frequency was identified.

Schedule

  • Installation of the geophone pod into the OMC chamber on 7/10.
  • Move the TAMA-SAS tower from the warehouse to the ATC lab on 7/19.

Toward O5

Discussion

Next meeting

  • 2023/7/21 10:00-