Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/7/28 13:00-
Participants:
Suspensions
- Type-A:
- Type-B:
- Type-Bp:
- Type-C:
Other items
- Oplev:
- ACC:
- Commissioning:
- Vacuum system: Leak test of the OMC chamber.
- Heater control:
- TMS:
Post O4a
- Measurements of the DAC noise: The next time on 8/4.
- Measurements on the sensor correction in SR2: 1 night.
- Optimization of the damping control in PRs: Measurements 2 days, Test 3 days.
- IP control with the ACCs: Postponed the long-term test in IY.
- In-vacuum accelerometer for IOO:
Hight adjustments of Type-A in the cooling: The procedure. Cooling was started on 7/27.
- Noise budget of the suspensions:
- Temperature control for the Oplev: Preparing for the heater controller.