Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/9/1 13:00-
Participants:
Suspensions
- Type-A:
- Type-B:
- Type-Bp:
- Type-C:
Other items
- Oplev:
- ACC:
- Commissioning:
- Vacuum system:
- Heater control:
- TMS:
Post O4a
- Measurements of the DAC noise: Type-C.
- Measurements on the sensor correction in SR2: Response from Terrence.
- Optimization of the damping control in PRs: Measurements 2 days, Test 3 days.
- IP control with the ACCs: One more test is necessary.
- In-vacuum accelerometer for IOO: Leak test of the pod is planed.
- Hight adjustments of Type-A in the cooling: Monitor from 9/8.
- Temperature control for the Oplev: Prepare for IXC and EXC.
- TM cooling: Schedule.
- IM heater: Installation for IX in the week of 9/4.
- Summary of cooling.
Discussion
VIS Meeting
Date: 2023/9/1 10:00-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
Type-C
- Damping of the OMC suspension.
- Test of the blade damper.
- Design of the flexible pendulum damper.
Electronics
Control
R&D
- TAMA-SAS experiment: Assembly of the Roberts Linkage.
Schedule
- TAMA-SAS experiment.
- Finalization of the OMC damper.
Toward O5
Discussion
Next meeting
- 2023/9/8 10:00-