<> = Agenda/Minutes = [[https://zoom.us/j/203743987|Zoom Meeting]] ---------- = CRY+VIS Interface Meeting = Date: 2023/9/8 13:00-13:26 Participants: Takahashi, Miyaki, Ushiba, Yokozawa, Mitsuhashi, Sato, Aso, Hirata, Nod, Akutsu, Kimura [[https://paper.dropbox.com/folder/show/AcceptanceTest-e.1gg8YzoPEhbTkrhvQwJ2zzo3dHVh5sJGieDgbm2n3h60mGqotBeE|Acceptance check document]] == Suspensions == * Type-A: Pitch oscillation at 1.5Hz in ITMX. Trip in ETMY. * Type-B: * Type-Bp: Test of the damping control in PR2. * Type-C: == Other items == * Oplev: * ACC: * Commissioning: * Vacuum system: Preparation for the heat up in EX. * Heater control: * TMS: == Post O4a == * Measurements of the DAC noise: Type-C. * Measurements on the sensor correction in SR2: Scheduled on 9/12 by Terrence. * Optimization of the damping control in PRs: Tested in PR2. Next for PRM/PR3. * IP control with the ACCs: One more test is necessary. * In-vacuum accelerometer for IOO: Leak test of the pod is planned. Feedthrough for OMC should be replaced to a single connector type. * Hight adjustments of Type-A in the cooling: Monitor of ETMX from 9/8. * Temperature control for the Oplev: Prepare for IXC and EXC. * TM cooling: IY will be started on 9/11. * IM heater: Installation to IX/IY on 9/8. == Discussion == ----------