Line 43: Line 43:
Date: 2023/9/28 10:00- Date: 2023/9/28 10:15-11:00
Line 45: Line 45:
Participants: Participants: Takahashi, Sato, Mitsuhashi, Hirata, Tanaka, Aso
Line 56: Line 56:
  * Ordering of the parts of damper.   * Ordering of the damper parts.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/9/29 13:00-

Participants:

Acceptance check document

Suspensions

  • Type-A: Height adjustment of ETMX. Offload in IX. Adjustment of the damping loop in EX. Diagonalization of the payload actuators in EX. Update of the MN Y Oplev damping loop in IY.
  • Type-B:
  • Type-Bp:
  • Type-C:

Other items

  • Oplev: Preparation of the temperature controls for IXC and EXC.
  • ACC:
  • Commissioning:
  • Vacuum system: Opened the GVs in EX.
  • Heater control:
  • TMS:

Post O4a

  • Measurements of the DAC noise: Type-C.
  • Optimization of the damping control in PRs: Test for PR3 again in the next week.
  • IP control with the ACCs: One more test in the next week.
  • In-vacuum accelerometer for IOO: Leak test of the pod in the next week.
  • Hight adjustments of Type-A in the cooling: Monitoring.
  • Temperature control for the Oplev: Preparation for IXC and EXC.
  • TM cooling: Schedule.
  • IM heater:
  • OMC damper: The parts have been ordered.

Discussion


VIS Meeting

Date: 2023/9/28 10:15-11:00

Participants: Takahashi, Sato, Mitsuhashi, Hirata, Tanaka, Aso

Summary Report

Type-A

  • Height adjustment of ETMX.
  • Offload of F0 in IX. The FR reached a hardware limit, so the setpoint was changed.

Type-B

Type-Bp

Type-C

  • Damping of the OMC suspension.
    • Ordering of the damper parts.
    • Prototype test of the flexible pendulum damper.

Electronics

Control

R&D

  • TAMA-SAS experiment: Reassembly of the RL.

Schedule

  • TAMA-SAS experiment.
  • Preparation for the OMC damper.

Toward O5

Discussion

Next meeting

  • 2023/10/13 10:00-