Differences between revisions 1 and 3 (spanning 2 versions)
Revision 1 as of 2023-10-05 12:45:33
Size: 1110
Comment:
Revision 3 as of 2023-10-06 13:38:53
Size: 1371
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
Date: 2023/10/6 13:00- Date: 2023/10/6 13:00-13:30
Line 10: Line 10:
Participants: Participants: Takahashi, Uchiyama, Aso, Yokozawa, Sato, Miyoki, Akutsu, Ushiba, Mitsuhashi
Line 15: Line 15:
 * Type-A: Offload in IX. Test of IP control with ACCs in IY.
 * Type-B:
 * Type-A: Offload in IX. Test of IP control with ACCs in IY. Update of damping control.
 * Type-B: Update of damping control.
Line 21: Line 21:
 * Oplev:  * Oplev: Centering of the MN oplev in EY.
Line 24: Line 24:
 * Vacuum system: Investigation of the TMP in X-27.  * Vacuum system: Investigation of the TMP in X-27. GV remote operation was implemented.
Line 32: Line 32:
 * In-vacuum accelerometer for IOO: Leak test of the geophone pods.  * In-vacuum accelerometer for IOO: Leak test of the geophone pods. The new pod passed for the OMC chamber.
Line 34: Line 34:
 * Temperature control for the Oplev: Preparation for IXC and EXC.  * Temperature control for the Oplev: Installation in IXC and EXC was finished.
Line 36: Line 36:
 * IM heater: EX remains.  * IM heater: Installed to EX.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/10/6 13:00-13:30

Participants: Takahashi, Uchiyama, Aso, Yokozawa, Sato, Miyoki, Akutsu, Ushiba, Mitsuhashi

Acceptance check document

Suspensions

  • Type-A: Offload in IX. Test of IP control with ACCs in IY. Update of damping control.
  • Type-B: Update of damping control.
  • Type-Bp:
  • Type-C:

Other items

  • Oplev: Centering of the MN oplev in EY.
  • ACC:
  • Commissioning:
  • Vacuum system: Investigation of the TMP in X-27. GV remote operation was implemented.
  • Heater control:
  • TMS:

Post O4a

  • Measurements of the DAC noise: Type-C.
  • Optimization of the damping control in PRs: Test for PR3 again.
  • IP control with the ACCs: One more test.
  • In-vacuum accelerometer for IOO: Leak test of the geophone pods. The new pod passed for the OMC chamber.
  • Height adjustments of Type-A in the cooling: Monitoring.
  • Temperature control for the Oplev: Installation in IXC and EXC was finished.
  • TM cooling: Schedule.
  • IM heater: Installed to EX.
  • OMC damper: The parts have been ordered. Vent on 10/13.

Discussion


KAGRA/Subgroups/VIS/VISMinutes20231006 (last edited 2023-10-06 13:38:53 by RyutaroTakahashi)