Date: 2023/10/6 13:00- | Date: 2023/10/6 13:00-13:30 |
Line 10: | Line 10: |
Participants: | Participants: Takahashi, Uchiyama, Aso, Yokozawa, Sato, Miyoki, Akutsu, Ushiba, Mitsuhashi |
Line 15: | Line 15: |
* Type-A: Offload in IX. Test of IP control with ACCs in IY. * Type-B: |
* Type-A: Offload in IX. Test of IP control with ACCs in IY. Update of damping control. * Type-B: Update of damping control. |
Line 21: | Line 21: |
* Oplev: | * Oplev: Centering of the MN oplev in EY. |
Line 24: | Line 24: |
* Vacuum system: Investigation of the TMP in X-27. | * Vacuum system: Investigation of the TMP in X-27. GV remote operation was implemented. |
Line 32: | Line 32: |
* In-vacuum accelerometer for IOO: Leak test of the geophone pods. | * In-vacuum accelerometer for IOO: Leak test of the geophone pods. The new pod passed for the OMC chamber. |
Line 34: | Line 34: |
* Temperature control for the Oplev: Preparation for IXC and EXC. | * Temperature control for the Oplev: Installation in IXC and EXC was finished. |
Line 36: | Line 36: |
* IM heater: EX remains. | * IM heater: Installed to EX. |
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/10/6 13:00-13:30
Participants: Takahashi, Uchiyama, Aso, Yokozawa, Sato, Miyoki, Akutsu, Ushiba, Mitsuhashi
Suspensions
- Type-A: Offload in IX. Test of IP control with ACCs in IY. Update of damping control.
- Type-B: Update of damping control.
- Type-Bp:
- Type-C:
Other items
- Oplev: Centering of the MN oplev in EY.
- ACC:
- Commissioning:
- Vacuum system: Investigation of the TMP in X-27. GV remote operation was implemented.
- Heater control:
- TMS:
Post O4a
- Measurements of the DAC noise: Type-C.
- Optimization of the damping control in PRs: Test for PR3 again.
- IP control with the ACCs: One more test.
- In-vacuum accelerometer for IOO: Leak test of the geophone pods. The new pod passed for the OMC chamber.
- Height adjustments of Type-A in the cooling: Monitoring.
- Temperature control for the Oplev: Installation in IXC and EXC was finished.
- TM cooling: Schedule.
- IM heater: Installed to EX.
- OMC damper: The parts have been ordered. Vent on 10/13.
Discussion