Agenda/Minutes

Zoom Meeting


VIS Meeting

Date: 2023/10/27 10:00-

Participants:

Summary Report

Type-A

  • Height adjustment of ETMX.
  • Test of the IP control with ACC in IY.

Type-B

Type-Bp

Type-C

  • The geophone pod was installed to the OMC chamber on 10/17.
  • The blade/board dampers for the OMC suspension was Installed on 10/17-18.

Electronics

Control

R&D

  • TAMA-SAS experiment: Calculation of the RL potential.

Schedule

  • TAMA-SAS experiment.

Toward O5

Discussion

Next meeting

  • 2023/11/10 10:00-