Line 8: Line 8:
Date: 2023/10/27 10:00- Date: 2023/10/27 10:00-10:50
Line 10: Line 10:
Participants: Participants: Takahashi, Mitsuhashi, Tanaka, Sato, Hirata, Aso
Line 33: Line 33:
 * Design of the mini-GAS clamps for the KFC suspension.

Agenda/Minutes

Zoom Meeting


VIS Meeting

Date: 2023/10/27 10:00-10:50

Participants: Takahashi, Mitsuhashi, Tanaka, Sato, Hirata, Aso

Summary Report

Type-A

  • Height adjustment of ETMX.
  • Test of the IP control with ACC in IY.

Type-B

Type-Bp

Type-C

  • The geophone pod was installed to the OMC chamber on 10/17.
  • The blade/board dampers for the OMC suspension was Installed on 10/17-18.

Electronics

Control

R&D

  • TAMA-SAS experiment: Calculation of the RL potential.

Schedule

  • TAMA-SAS experiment.

Toward O5

  • Dropbox paper

  • Design of the mini-GAS clamps for the KFC suspension.

Discussion

Next meeting

  • 2023/11/10 10:00-