Differences between revisions 4 and 5
Revision 4 as of 2023-10-27 10:56:10
Size: 945
Comment:
Revision 5 as of 2023-10-27 10:57:32
Size: 942
Comment:
Deletions are marked like this. Additions are marked like this.
Line 32: Line 32:
 * [[https://paper.dropbox.com/doc/VIS-upgrade-toward-O5--B6qw57_1ZTHOEO_ZdAZi0hBjAQ-PJElGnRfe5jbNPeHWDHzi|Dropbox paper]] [[https://paper.dropbox.com/doc/VIS-upgrade-toward-O5--B6qw57_1ZTHOEO_ZdAZi0hBjAQ-PJElGnRfe5jbNPeHWDHzi|Dropbox paper]]

Agenda/Minutes

Zoom Meeting


VIS Meeting

Date: 2023/10/27 10:00-10:50

Participants: Takahashi, Mitsuhashi, Tanaka, Sato, Hirata, Aso

Summary Report

Type-A

  • Height adjustment of ETMX.
  • Test of the IP control with ACC in IY.

Type-B

Type-Bp

Type-C

  • The geophone pod was installed to the OMC chamber on 10/17.
  • The blade/board dampers for the OMC suspension was Installed on 10/17-18.

Electronics

Control

R&D

  • TAMA-SAS experiment: Calculation of the RL potential.

Schedule

  • TAMA-SAS experiment.

Toward O5

Dropbox paper

  • Design of the mini-GAS clamps for the KFC suspension.

Discussion

Next meeting

  • 2023/11/10 10:00-

KAGRA/Subgroups/VIS/VISMinutes20231027 (last edited 2023-10-27 10:57:32 by RyutaroTakahashi)