945
Comment:
|
← Revision 5 as of 2023-10-27 10:57:32 ⇥
942
|
Deletions are marked like this. | Additions are marked like this. |
Line 32: | Line 32: |
* [[https://paper.dropbox.com/doc/VIS-upgrade-toward-O5--B6qw57_1ZTHOEO_ZdAZi0hBjAQ-PJElGnRfe5jbNPeHWDHzi|Dropbox paper]] | [[https://paper.dropbox.com/doc/VIS-upgrade-toward-O5--B6qw57_1ZTHOEO_ZdAZi0hBjAQ-PJElGnRfe5jbNPeHWDHzi|Dropbox paper]] |
Contents
Agenda/Minutes
VIS Meeting
Date: 2023/10/27 10:00-10:50
Participants: Takahashi, Mitsuhashi, Tanaka, Sato, Hirata, Aso
Summary Report
Type-A
- Height adjustment of ETMX.
- Test of the IP control with ACC in IY.
Type-B
Type-Bp
Type-C
- The geophone pod was installed to the OMC chamber on 10/17.
- The blade/board dampers for the OMC suspension was Installed on 10/17-18.
Electronics
Control
R&D
- TAMA-SAS experiment: Calculation of the RL potential.
Schedule
- TAMA-SAS experiment.
Toward O5
- Design of the mini-GAS clamps for the KFC suspension.
Discussion
Next meeting
- 2023/11/10 10:00-