Line 8: Line 8:
Date: 2023/11/10 14:00- Date: 2023/11/10 14:00-14:20
Line 10: Line 10:
Participants: Participants: Takahashi, Mitsuhashi, Uchiyama, Yokozawa, Miyoki, Aso, Ushiba, Kimura
Line 24: Line 24:
 * Vacuum system:  * Vacuum system: GV control by not MDEM but SwitchBot. Automation using additional vacuum gauges.
Line 32: Line 32:
 * In-vacuum accelerometer for IOO: Preparing the geophone pod for IFI chamber.  * In-vacuum accelerometer for IOO: Preparing the geophone pod for IFI chamber. Ag coat screw with ditch is necessary.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/11/10 14:00-14:20

Participants: Takahashi, Mitsuhashi, Uchiyama, Yokozawa, Miyoki, Aso, Ushiba, Kimura

Acceptance check document

Suspensions

  • Type-A: Height adjustment of ETMX and ETMY. Trouble of stepper motors in EY. Update of MN OL damp in IY.
  • Type-B:
  • Type-Bp: Check of PRM suspension control.
  • Type-C:

Other items

  • Oplev:
  • ACC:
  • Commissioning:
  • Vacuum system: GV control by not MDEM but SwitchBot. Automation using additional vacuum gauges.

  • Heater control: Changed the setpoint in IY.
  • TMS:

Post O4a

  • Measurements of the DAC noise: Type-C.
  • Optimization of the damping control in PRs: PR3.
  • IP control with the ACCs: One more test.
  • In-vacuum accelerometer for IOO: Preparing the geophone pod for IFI chamber. Ag coat screw with ditch is necessary.
  • Height adjustments of Type-A in the cooling: Continued.

Discussion


VIS Meeting

Date: 2023/11/10 10:00-12:00

Participants: Mitsuhashi, Aso, Takahashi, Sato, Hirata, Tanaka, Tomaru, Otsuka

Summary Report

Type-A

  • Height adjustment of ETMX and ETMY.
  • Trouble of the stepper motors in EY.

Type-B

Type-Bp

Type-C

Electronics

Control

R&D

  • TAMA-SAS experiment: Measurement of RL resonances.
  • Calculation of the RL potential.

Schedule

  • TAMA-SAS experiment.

Toward O5

Dropbox paper

  • Design and test of the mini-GAS for the KFC suspension.

Discussion

Next meeting

  • 2023/11/24 10:00-