Differences between revisions 1 and 2
Revision 1 as of 2023-11-16 09:19:59
Size: 1015
Comment:
Revision 2 as of 2023-11-17 11:01:48
Size: 1019
Comment:
Deletions are marked like this. Additions are marked like this.
Line 17: Line 17:
 * Type-Bp: Modification of the PRM TM OLDAMP_P/Y filters in PRM.  * Type-Bp: Modification of the TM OLDAMP_P/Y filters in PRM and PR3.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/11/17 13:00-

Participants:

Acceptance check document

Suspensions

  • Type-A: Height adjustment of ETMY. Modification of the MN OLDAMP_P filters.
  • Type-B:
  • Type-Bp: Modification of the TM OLDAMP_P/Y filters in PRM and PR3.
  • Type-C:

Other items

  • Oplev: Temperature adjustment for the MN TILT oplev in EY.
  • ACC:
  • Commissioning:
  • Vacuum system:
  • Heater control:
  • TMS:

Post O4a

  • Measurements of the DAC noise: Type-C.
  • Optimization of the damping control in PRs: PR3.
  • IP control with the ACCs: One more test.
  • In-vacuum accelerometer for IOO: Preparing the geophone pod for IFI chamber.
  • Height adjustments of Type-A in the cooling: Continued.

Discussion


KAGRA/Subgroups/VIS/VISMinutes20231117 (last edited 2023-11-17 14:00:37 by RyutaroTakahashi)