Date: 2023/12/1 13:00- | Date: 2023/12/1 13:00-13:20 |
Line 10: | Line 10: |
Participants: | Participants: Takahashi, Sato, Akutsu, Mitsuhashi, Hirata, Yokozawa, Aso, Node |
Line 21: | Line 21: |
* Oplev: Some problems on the MN LEN Oplev in EY and IY. | * Oplev: MN LEN Oplev in EY became mpisy. Some points (ADC, ghost beam, QPD, Dsub connector, P-L coupling, etc) are under investigation. |
Line 31: | Line 32: |
* IP control with the ACCs: One more test. | * IP control with the ACCs: One more test. TF around 1mHz should be measured. |
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/12/1 13:00-13:20
Participants: Takahashi, Sato, Akutsu, Mitsuhashi, Hirata, Yokozawa, Aso, Node
Suspensions
- Type-A:
- Type-B:
- Type-Bp: Test of the damping control in PR3.
- Type-C:
Other items
- Oplev: MN LEN Oplev in EY became mpisy. Some points (ADC, ghost beam, QPD, Dsub connector, P-L coupling, etc) are under investigation.
- ACC:
- Commissioning:
Vacuum system: Interlock system for the pumps (Plan).
- Heater control:
- TMS:
Post O4a
- Measurements of the DAC noise: Type-C.
- Optimization of the damping control in PRs: PR3.
- IP control with the ACCs: One more test. TF around 1mHz should be measured.
- In-vacuum accelerometer for IOO: Preparation for the geophone pod for IFI chamber.
- Height adjustments of Type-A in the cooling: EY in the next cooling.