Line 8: Line 8:
Date: 2024/1/5 13:00- Date: 2024/1/5 13:00-13:30
Line 10: Line 10:
Participants: Participants: Takahashi, Akutsu, Ushiba, Uchiyama, Sato, Aso
Line 17: Line 17:
 * Type-Bp: TRIPPED. Update of the local control in PR2/3
 * Type-C: TRIPPED in OMMT1/2/OSTM. READY in MCI. LOCKACC. in IMMT1/2. Oplev loss in MCO/MCE.
 * Type-Bp: TRIPPED (PR3 would deviate much.) Update of the local control in PR2/3.
 * Type-C: TRIPPED in OMMT1/2/OSTM. READY in MCI. LOCKACC. in MCE/IMMT1/2. Oplev signal loss in MCO.
Line 21: Line 21:
 * Oplev: Investigating the MN LEN Oplev in EY.  * Oplev: Investigating the MN LEN Oplev in EY. BS was not fixed. Eyelis was covered with Al foil and the fiber edge was placed in the windshield.
Line 24: Line 24:
 * Vacuum system:  * Vacuum system: GVs were closed remotely.
Line 32: Line 32:
 * In-vacuum accelerometer for IOO: Leak test of the geophone pod was scheduled for 1/11, but it will be postpone.  * In-vacuum accelerometer for IOO: Leak test of the geophone pod was scheduled for 1/11, but it will be postponed.
Line 34: Line 34:
 * IMC open:
Line 39: Line 40:
Date: 2024/1/5 11:00- Date: 2024/1/5 11:00-12:00
Line 41: Line 42:
Participants: Participants: Takahashi, Mitsuhashi, Sato, Ushiba

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2024/1/5 13:00-13:30

Participants: Takahashi, Akutsu, Ushiba, Uchiyama, Sato, Aso

Acceptance check document

Suspensions

  • Type-A: TRIPPED. Height adjustment on 12/28 in EY. Test of the IP control in IY.
  • Type-B: TRIPPED.
  • Type-Bp: TRIPPED (PR3 would deviate much.) Update of the local control in PR2/3.
  • Type-C: TRIPPED in OMMT1/2/OSTM. READY in MCI. LOCKACC. in MCE/IMMT1/2. Oplev signal loss in MCO.

Other items

  • Oplev: Investigating the MN LEN Oplev in EY. BS was not fixed. Eyelis was covered with Al foil and the fiber edge was placed in the windshield.
  • ACC:
  • Commissioning:
  • Vacuum system: GVs were closed remotely.
  • Heater control:
  • TMS:

Post O4a

  • Measurements of the DAC noise: Type-C.
  • Optimization of the damping control in PRs:
  • IP control with the ACCs: Test in IY.
  • In-vacuum accelerometer for IOO: Leak test of the geophone pod was scheduled for 1/11, but it will be postponed.
  • Height adjustments of Type-A in the cooling: Continuing in EY.
  • IMC open:

Discussion


VIS Meeting

Date: 2024/1/5 11:00-12:00

Participants: Takahashi, Mitsuhashi, Sato, Ushiba

Summary Report

Type-A

  • Test of the IP control in IY.
  • Height adjustment of ETMY.

Type-B

Type-Bp

Type-C

Electronics

Control

R&D

  • TAMA-SAS experiment: Measurement of the IP+RL transfer functions.
  • Paper writing on the RL.

Schedule

  • Recovery of the suspensions in KAGRA.

Toward O5

Dropbox paper

  • Kick-off meeting for O5 task force on 1/16.
  • Preparation for the test of mini-GAS for the KFC suspension.

Discussion

Next meeting

  • 2024/1/19 10:00-