VIS Meeting

Date: 2024/8/16 10:00-

Zoom

Participants:

Topics

Type-A

  • IP controls using ACCs
    • Test of the 50mHz blending in EY. The performance of the H2 FLDACC is not good.

Type-B/Bp

  • BF damper for Type-B.
  • IP for Type-Bp.

Type-C

  • OMC stack
    • Change of the stages from 3 to 1-2. The performance will be tested using the TAMA stack.
    • Investigation of soft rubbers.
  • Active isolation table for OMC by ATC.
    • Design in 2024FY, Procurement and assembly in 2025FY, Evaluation and installation from 2026 spring-summer.

R&D

  • Protection from earthquakes
    • Application for R7 Kakenhi (Memo)

Discussion

Next meeting

  • 2024/9/13 10:00-

KAGRA/Subgroups/VIS/VISMinutes20240816 (last edited 2024-08-16 10:57:14 by RyutaroTakahashi)