⇤ ← Revision 1 as of 2024-09-12 09:02:25
Size: 891
Comment:
|
Size: 950
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 23: | Line 23: |
* The performance of the 1 or 2-layer stack was tested in TAMA. | * The performance of the 1 or 2-layer stack was tested in TAMA ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=31004|klog]]). |
Line 26: | Line 26: |
* Ask ATC to modify the design of the TMS isolator. | * Asking ATC to modify the design of the TMS isolator. |
Contents
VIS Meeting
Date: 2024/9/13 10:00-
Participants:
Topics
Type-A
- IP controls using ACCs
50mHz blending without the ACCs is working in EY. The sensor correction was tuned (klog)).
- Investigation of the FLDACC performance in EY. Making the noise budgets.
Type-B/Bp
- BF (IRM) damper for Type-B.
- IP for Type-Bp.
Type-C
- OMC stack
The performance of the 1 or 2-layer stack was tested in TAMA (klog).
- Investigation of soft rubbers towards O5.
- Active isolation table for OMC.
- Asking ATC to modify the design of the TMS isolator.
R&D
- Protection from earthquakes
- Application for R7 Kakenhi has been submitted.
Discussion
Next meeting
- 2024/9/27 10:00-