Differences between revisions 5 and 6
Revision 5 as of 2024-09-12 18:05:06
Size: 1052
Comment:
Revision 6 as of 2024-09-13 10:41:12
Size: 1088
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
Date: 2024/9/13 10:00- Date: 2024/9/13 10:00-10:30
Line 9: Line 9:
Participants: Participants: Aso, Washimi, Tanaka, Takahashi


VIS Meeting

Date: 2024/9/13 10:00-10:30

Zoom

Participants: Aso, Washimi, Tanaka, Takahashi

Topics

Type-A

  • IP controls using ACCs
    • 50mHz blending without the ACCs is working in EY. The sensor correction was tuned (klog).

    • Investigation of the FLDACC performance in EY. Making the noise budgets.

Type-B/Bp

  • Yaw damper for Type-B.
  • IP for Type-Bp.

Type-C

  • OMC stack
    • The performance of the 1 or 2-layer stack was tested in TAMA (klog).

    • Investigation of soft rubbers toward O5 (Slide).

  • Active isolation table for OMC.
    • Asking ATC to modify the design of the TMS isolator.

R&D

  • Protection from earthquakes
    • Application for R7 Kakenhi has been submitted.

Discussion

Next meeting

  • 2024/9/27 10:00-

KAGRA/Subgroups/VIS/VISMinutes20240913 (last edited 2024-09-13 10:41:12 by RyutaroTakahashi)