⇤ ← Revision 1 as of 2024-09-26 09:11:01
Size: 638
Comment:
|
Size: 638
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 22: | Line 22: |
* The performance of the 2-layer stack was tested in TAMA ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=31004|klog]]). | * The performance of the 2-layer stack was tested in TAMA ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=30871|klog]]). |
Contents
VIS Meeting
Date: 2024/9/27 10:00-
Participants:
Topics
Type-A
- IP controls using ACCs
- Investigation of the FLDACC performance in EY.
Type-B/Bp
- Yaw damper for Type-B.
- IP for Type-Bp.
Type-C
- OMC stack
The performance of the 2-layer stack was tested in TAMA (klog).
- Active isolation table for OMC.
- Asked ATC to modify the design of the TMS isolator.
R&D
Discussion
Next meeting
- 2024/10/11 10:00-