Differences between revisions 1 and 6 (spanning 5 versions)
Revision 1 as of 2024-09-26 09:11:01
Size: 638
Comment:
Revision 6 as of 2024-09-27 10:27:56
Size: 763
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
Date: 2024/9/27 10:00- Date: 2024/9/27 10:00-10:25
Line 9: Line 9:
Participants: Participants: Aso, Tanaka, Yokozawa, Sato, Ushiba, Takahashi
Line 14: Line 14:
  * Investigation of the FLDACC performance in EY.   * Investigation of the FLDACC performance in EY ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=31134|klog]]).
Line 22: Line 22:
  * The performance of the 2-layer stack was tested in TAMA ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=31004|klog]]).   * Test of the 2-layer stack is ongoing in TAMA ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=30871|klog]]).
  * Preparing the sidebars.


VIS Meeting

Date: 2024/9/27 10:00-10:25

Zoom

Participants: Aso, Tanaka, Yokozawa, Sato, Ushiba, Takahashi

Topics

Type-A

  • IP controls using ACCs
    • Investigation of the FLDACC performance in EY (klog).

Type-B/Bp

  • Yaw damper for Type-B.
  • IP for Type-Bp.

Type-C

  • OMC stack
    • Test of the 2-layer stack is ongoing in TAMA (klog).

    • Preparing the sidebars.
  • Active isolation table for OMC.
    • Asked ATC to modify the design of the TMS isolator.

R&D

Discussion

Next meeting

  • 2024/10/11 10:00-

KAGRA/Subgroups/VIS/VISMinutes20240927 (last edited 2024-09-27 10:27:56 by RyutaroTakahashi)