Differences between revisions 2 and 4 (spanning 2 versions)
Revision 2 as of 2024-09-26 09:13:11
Size: 638
Comment:
Revision 4 as of 2024-09-26 09:40:21
Size: 656
Comment:
Deletions are marked like this. Additions are marked like this.
Line 22: Line 22:
  * The performance of the 2-layer stack was tested in TAMA ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=30871|klog]]).   * Test of the 2-layer stack is ongoing in TAMA ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=30871|klog]]).
  * Preparing the sidebars.


VIS Meeting

Date: 2024/9/27 10:00-

Zoom

Participants:

Topics

Type-A

  • IP controls using ACCs
    • Investigation of the FLDACC performance in EY.

Type-B/Bp

  • Yaw damper for Type-B.
  • IP for Type-Bp.

Type-C

  • OMC stack
    • Test of the 2-layer stack is ongoing in TAMA (klog).

    • Preparing the sidebars.
  • Active isolation table for OMC.
    • Asked ATC to modify the design of the TMS isolator.

R&D

Discussion

Next meeting

  • 2024/10/11 10:00-

KAGRA/Subgroups/VIS/VISMinutes20240927 (last edited 2024-09-27 10:27:56 by RyutaroTakahashi)