Differences between revisions 3 and 5 (spanning 2 versions)
Revision 3 as of 2024-09-26 09:14:33
Size: 627
Comment:
Revision 5 as of 2024-09-26 17:18:31
Size: 712
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
  * Investigation of the FLDACC performance in EY.   * Investigation of the FLDACC performance in EY ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=31134|klog]]).
Line 23: Line 23:
  * Preparing the sidebars.


VIS Meeting

Date: 2024/9/27 10:00-

Zoom

Participants:

Topics

Type-A

  • IP controls using ACCs
    • Investigation of the FLDACC performance in EY (klog).

Type-B/Bp

  • Yaw damper for Type-B.
  • IP for Type-Bp.

Type-C

  • OMC stack
    • Test of the 2-layer stack is ongoing in TAMA (klog).

    • Preparing the sidebars.
  • Active isolation table for OMC.
    • Asked ATC to modify the design of the TMS isolator.

R&D

Discussion

Next meeting

  • 2024/10/11 10:00-

KAGRA/Subgroups/VIS/VISMinutes20240927 (last edited 2024-09-27 10:27:56 by RyutaroTakahashi)