Differences between revisions 1 and 2
Revision 1 as of 2024-10-10 17:05:34
Size: 728
Comment:
Revision 2 as of 2024-10-10 17:05:58
Size: 716
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
  * Investigation of the FLDACC performance in EY ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=31233|klog]]).   * Investigation of the FLDACC in EY ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=31233|klog]]).


VIS Meeting

Date: 2024/10/11 10:00

Zoom

Participants:

Topics

Type-A

  • IP controls using ACCs
    • Investigation of the FLDACC in EY (klog).

Type-B/Bp

  • Yaw damper for Type-B.
  • IP for Type-Bp.

Type-C

  • OMC stack
    • Test of the 2-layer stack was finished in TAMA (klog).

    • The sidebars were delivered on 10/7.
  • Active isolation table for OMC.
    • Asking ATC to modify the design of the TMS isolator.

R&D

Discussion

Next meeting

  • 2024/10/25 10:00-

KAGRA/Subgroups/VIS/VISMinutes20241011 (last edited 2024-10-11 10:33:09 by RyutaroTakahashi)