VIS Meeting

Date: 2024/10/11 10:00

Zoom

Participants:

Topics

Type-A

  • IP controls using ACCs
    • Investigation of the FLDACCs. (EY,others).

Type-B/Bp

  • Yaw damper for Type-B.
  • IP for Type-Bp.

Type-C

  • OMC stack
    • Test of the 2-layer stack was finished in TAMA (klog).

    • The sidebars were delivered on 10/7.
    • Checked the vertical geophones.
  • Active isolation table for OMC.
    • Asking ATC to modify the design of the TMS isolator.

R&D

Discussion

Next meeting

  • 2024/10/25 10:00-