Size: 753
Comment:
|
← Revision 5 as of 2024-10-11 10:33:09 ⇥
Size: 900
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 5: | Line 5: |
| Date: 2024/10/11 10:00 | Date: 2024/10/11 10:00-10:30 |
| Line 9: | Line 9: |
| Participants: | Participants: Aso, Washimi, Ushiba, Yokozawa, Miyoki, Tanaka, Takahashi |
| Line 14: | Line 14: |
| * Investigation of the FLDACC in EY ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=31233|klog]]). | * Investigation of the FLDACCs. ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=31233|EY]],[[https://klog.icrr.u-tokyo.ac.jp/osl/?r=31146|others]]). |
| Line 31: | Line 31: |
| * Isolation in the IFI chamber. |
Contents
VIS Meeting
Date: 2024/10/11 10:00-10:30
Participants: Aso, Washimi, Ushiba, Yokozawa, Miyoki, Tanaka, Takahashi
Topics
Type-A
Type-B/Bp
- Yaw damper for Type-B.
- IP for Type-Bp.
Type-C
- OMC stack
Test of the 2-layer stack was finished in TAMA (klog).
- The sidebars were delivered on 10/7.
- Checked the vertical geophones.
- Active isolation table for OMC.
- Asking ATC to modify the design of the TMS isolator.
R&D
Discussion
- Isolation in the IFI chamber.
Next meeting
- 2024/10/25 10:00-