Date: 2025/1/17 10:00- Date: 2025/1/17 10:00-10:40
Line 9: Line 9:
Participants: Participants: Sato, Tanaka, Ushiba, Yokozawa, Washimi, Takahashi
Line 14: Line 14:
  * Final adjustment was performed on Jan. 17th.
Line 15: Line 16:
  * Preparing for the stand-alone test bench with DGS in Mitaka.   * Preparing for the stand-alone test bench with DGS in Mitaka. Ikeda-san has set the DGS up in the ATC lab.
Line 19: Line 20:
  * Asking Tanaka-san. The card has a regulator to convert +/-18V to +/-15V.
Line 20: Line 22:
  * One set should be tested in SRM around autumn 2025.
Line 24: Line 27:
  * Sato-san is checking the fitting condition of the TMS isolator to the OMC chamber ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=16431|update]]).   * Sato-san is checking the fitting condition of the TMS isolator to the OMC chamber ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=16431|update]]). The structural mode also should be checked.
Line 26: Line 29:
  * Measurement of STM using the laser sensor ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=32280|location]], [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=32293|clamping]]).   * Measurement of STM using the laser sensor ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=32280|location]], [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=32293|clamping]]). The work opening the IFI chamber is planned for mid-Feb.
 * Small Type-C suspensions with mini-GAS.


VIS Meeting

Date: 2025/1/17 10:00-10:40

Zoom

Participants: Sato, Tanaka, Ushiba, Yokozawa, Washimi, Takahashi

Topics

Type-A

  • Height adjustment during the cooling.
    • Final adjustment was performed on Jan. 17th.
  • ACCs for the IP controls.
    • Preparing for the stand-alone test bench with DGS in Mitaka. Ikeda-san has set the DGS up in the ATC lab.

Type-B/Bp

  • Enclosure for the SG card into an independent box.
    • Asking Tanaka-san. The card has a regulator to convert +/-18V to +/-15V.
  • Yaw damper for Type-B.
    • One set should be tested in SRM around autumn 2025.
  • IP for Type-Bp.

Type-C

  • Active isolation table for OMC.
    • Sato-san is checking the fitting condition of the TMS isolator to the OMC chamber (update). The structural mode also should be checked.

  • Vibration in the IFI chamber
    • Measurement of STM using the laser sensor (location, clamping). The work opening the IFI chamber is planned for mid-Feb.

  • Small Type-C suspensions with mini-GAS.

R&D

Discussion

Next meeting

  • 2025/1/31 10:00-

KAGRA/Subgroups/VIS/VISMinutes20250117 (last edited 2025-01-17 10:48:35 by RyutaroTakahashi)