VIS Meeting

Date: 2025/1/17 10:00-10:40

Zoom

Participants: Sato, Tanaka, Ushiba, Yokozawa, Washimi, Takahashi

Topics

Type-A

  • Height adjustment during the cooling.
    • Final adjustment was performed on Jan. 17th.
  • ACCs for the IP controls.
    • Preparing for the stand-alone test bench with DGS in Mitaka. Ikeda-san has set the DGS up in the ATC lab.

Type-B/Bp

  • Enclosure for the SG card into an independent box.
    • Asking Tanaka-san. The card has a regulator to convert +/-18V to +/-15V.
  • Yaw damper for Type-B.
    • One set should be tested in SRM around autumn 2025.
  • IP for Type-Bp.

Type-C

  • Active isolation table for OMC.
    • Sato-san is checking the fitting condition of the TMS isolator to the OMC chamber (update). The structural mode also should be checked.

  • Vibration in the IFI chamber
    • Measurement of STM using the laser sensor (location, clamping). The work opening the IFI chamber is planned for mid-Feb.

  • Small Type-C suspensions with mini-GAS.

R&D

Discussion

Next meeting

  • 2025/1/31 10:00-

KAGRA/Subgroups/VIS/VISMinutes20250117 (last edited 2025-01-17 10:48:35 by RyutaroTakahashi)