Size: 1013
Comment:
|
← Revision 9 as of 2025-01-31 10:30:42 ⇥
Size: 1349
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
Date: 2025/1/31 10:00- | Date: 2025/1/31 10:00-10:30 |
Line 9: | Line 9: |
Participants: | Participants: Ushiba, Washimi, Yokozawa, Tanaka, Sato, Takahashi, Miyoki |
Line 14: | Line 14: |
* Total (duct + TM) height change was 1~3mm. | * Total (duct + cryostat) height change was 1~3mm. |
Line 16: | Line 16: |
* Preparing for the stand-alone test bench with DGS in Mitaka. Ikeda-san has set the DGS up in the ATC lab. | * Preparing for the stand-alone test bench with DGS in Mitaka. Ikeda-san has set the DGS up in the ATC lab. |
Line 20: | Line 20: |
* Asking Tanaka-san who will make a prototype. | * Tanaka-san will make a prototype. |
Line 28: | Line 28: |
* Asking Marutsu to make geophone pre-amp boards. | |
Line 29: | Line 30: |
* Fixing the STM in the IFI chamber is planned for late February. | * Fixing the STM is planned for late February. |
Line 35: | Line 36: |
* Task list for authorship 2025. * Management of the group * Commissioning of the suspensions toward O4c * Maintenance of the suspensions during O4c * Preparation for upgrade toward O5 * Control upgrade * Software development |
Contents
VIS Meeting
Date: 2025/1/31 10:00-10:30
Participants: Ushiba, Washimi, Yokozawa, Tanaka, Sato, Takahashi, Miyoki
Topics
Type-A
- Height adjustment during the cooling.
- Total (duct + cryostat) height change was 1~3mm.
- ACCs for the IP controls.
- Preparing for the stand-alone test bench with DGS in Mitaka. Ikeda-san has set the DGS up in the ATC lab.
Type-B/Bp
- Enclosure for the SG card into an independent box.
- Tanaka-san will make a prototype.
- Yaw damper for Type-B.
- One set should be tested in SRM around autumn 2025.
- IP for Type-Bp.
Type-C
- Active isolation table for OMC.
- Sato-san is checking the parameters of the TMS isolator for OMC. He calculated the blade springs.
- Asking Marutsu to make geophone pre-amp boards.
- Vibration in the IFI chamber
- Fixing the STM is planned for late February.
- Small Type-C suspensions with mini-GAS.
R&D
Discussion
- Task list for authorship 2025.
- Management of the group
- Commissioning of the suspensions toward O4c
- Maintenance of the suspensions during O4c
- Preparation for upgrade toward O5
- Control upgrade
- Software development
Next meeting
- 2025/2/14 10:00-