Differences between revisions 3 and 4
Revision 3 as of 2025-02-14 09:50:53
Size: 1140
Comment:
Revision 4 as of 2025-02-14 10:14:17
Size: 1181
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
Date: 2025/2/14 10:00- Date: 2025/2/14 10:00-10:15
Line 9: Line 9:
Participants: Participants: Aso, Tanaka, Sato, Ushiba, Takahashi


VIS Meeting

Date: 2025/2/14 10:00-10:15

Zoom

Participants: Aso, Tanaka, Sato, Ushiba, Takahashi

Topics

Type-A

  • ACCs for the IP controls.
    • The stand-alone test bench for ACC with DGS was prepared in Mitaka. Ikeda-san recovered a problem in the DGS.

Type-B/Bp

  • Enclosure for the SG card into an independent box.
    • Tanaka-san is making a prototype.
  • Yaw damper for Type-B.
    • One set should be tested in SRM around autumn 2025.
  • IP for Type-Bp.

Type-C

  • Active isolation table for OMC.
    • Sato-san is checking the parameters of the TMS isolator for OMC. Recent update are here (blade spring, flexer).

    • Asking Marutsu to make geophone pre-amp boards.
  • Vibration in the IFI chamber
    • Fixing the STM in the IFI chamber is planned in March.
  • Small Type-C suspensions with mini-GAS.

R&D

Discussion

Next meeting

  • 2025/2/28 10:00-

KAGRA/Subgroups/VIS/VISMinutes20250214 (last edited 2025-02-14 10:16:18 by RyutaroTakahashi)