Size: 1455
Comment:
|
← Revision 6 as of 2025-06-06 11:12:23 ⇥
Size: 1515
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
Date: 2025/6/6 10:00- | Date: 2025/6/6 10:00-11:00 |
Line 9: | Line 9: |
Participants: | Participants: Miyoki, Aso, Yokozawa, Washimi, Sato, Hirata, Takahashi |
Contents
VIS Meeting
Date: 2025/6/6 10:00-11:00
Participants: Miyoki, Aso, Yokozawa, Washimi, Sato, Hirata, Takahashi
Review of IRM damper for Type-B suspension
Topics
Type-A
- ACCs for the IP controls.
Evaluation of the FLDACC with DGS in ATC is ongoing. The present status is here.
Type-B/Bp
- IRM damper for Type-B.
- The design work is ongoing by Hirata-san. After the review, he will proceed with creating the drawings of the parts.
- Enclosure for the SG card in an independent box.
- Tanaka-san made a prototype box. A 1U panel was prepared to mount the box.
- IP for Type-Bp.
Type-C
- Active isolation table for OMC.
- Small Type-C suspensions with mini-GAS.
R&D
Discussion
Next meeting
- 2025/6/20 10:00-