Differences between revisions 1 and 2
Revision 1 as of 2025-06-05 09:15:34
Size: 1152
Comment:
Revision 2 as of 2025-06-05 09:17:44
Size: 1156
Comment:
Deletions are marked like this. Additions are marked like this.
Line 28: Line 28:
  * We are finding a substitute for the L-4C geophone. We evaluating other geophones in ERI.   * We are finding a substitute for the L-4C geophone. We are evaluating other geophones in ERI.


VIS Meeting

Date: 2025/6/6 10:00-

Zoom

Participants:

Review of IRM damper for Type-B suspension

Topics

Type-A

  • ACCs for the IP controls.
    • Evaluation of the FLDACC with DGS in ATC is ongoing. The present status is here.

Type-B/Bp

  • IRM damper for Type-B.
    • The design work is ongoing by Hirata-san. After the review, he will proceed with creating the drawings of the parts.
  • Enclosure for the SG card in an independent box.
    • Tanaka-san made a prototype box. A 1U panel was prepared to mount the box.
  • IP for Type-Bp.

Type-C

  • Active isolation table for OMC.
    • The new geophone pre-amp. was evaluated (report).

    • We are finding a substitute for the L-4C geophone. We are evaluating other geophones in ERI.
  • Small Type-C suspensions with mini-GAS.

R&D

Discussion

Next meeting

  • 2025/6/20 10:00-

KAGRA/Subgroups/VIS/VISMinutes20250606 (last edited 2025-06-06 11:12:23 by RyutaroTakahashi)