VIS Meeting

Date: 2025/9/12 10:00-10:25

Zoom

Participants: Ushiba, Aso, Sato, Akutsu, Takahashi

Topics

Type-A

  • ACCs for the IP controls.
    • Evaluating the FLDACC with DGS in ATC (report). Noise budget should be made.

Type-B/Bp

  • IRM damper for Type-B.
    • Hirata-san will go to the preassembly.
  • Enclosure for the SG card in an independent box.
    • Preparing for a rack mount for the prototype box.
  • IP for Type-Bp.
    • Started a design.

Type-C

  • Active isolation table for OMC.
    • New geophone (SM-700C) will be delivered on Sep. 18.
    • The new geophone pod will be ordered soon.

    • Investigating the effects of cabling for the geophones (report).

    • The effects due to the tilt of the table should be checked. The gap in the IRM should be larger.
    • The height of the OMMT1 will be changed from 21cm to 20cm.
  • Small Type-C suspensions with mini-GAS.

R&D

Discussion

Next meeting

  • 2025/9/26 10:00-