VIS Meeting
Date: 2025/9/12 10:00-10:25
Participants: Ushiba, Aso, Sato, Akutsu, Takahashi
Topics
Type-A
- ACCs for the IP controls.
Evaluating the FLDACC with DGS in ATC (report). Noise budget should be made.
Type-B/Bp
- IRM damper for Type-B.
- Hirata-san will go to the preassembly.
- Enclosure for the SG card in an independent box.
- Preparing for a rack mount for the prototype box.
- IP for Type-Bp.
- Started a design.
Type-C
- Active isolation table for OMC.
- New geophone (SM-700C) will be delivered on Sep. 18.
The new geophone pod will be ordered soon.
Investigating the effects of cabling for the geophones (report).
- The effects due to the tilt of the table should be checked. The gap in the IRM should be larger.
- The height of the OMMT1 will be changed from 21cm to 20cm.
- Small Type-C suspensions with mini-GAS.
R&D
Discussion
Next meeting
- 2025/9/26 10:00-