Size: 1196
Comment:
|
Size: 1209
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 28: | Line 28: |
| * Investigating the effects of cabling for the geophones ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=16645|report]]). | * Investigating the effects of cabling and pre-amps for the geophones ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=16645|report]]). |
Contents
VIS Meeting
Date: 2025/9/26 10:00-
Participants:
Topics
Type-A
- ACCs for the IP controls.
Evaluating the FLDACC with DGS in ATC (report). Noise budget should be made.
Type-B/Bp
- IRM damper for Type-B.
- Hirata-san assembled the delivered parts.
- Enclosure for the SG card in an independent box.
- The prototype box was mounted in the 1U rack.
- IP for Type-Bp.
- Started a design.
Type-C
- Active isolation table for OMC.
- New geophone (SM-700C) was delivered on Sep. 18.
- The new geophone pod has been ordered.
Investigating the effects of cabling and pre-amps for the geophones (report).
- The effects due to the tilt of the table were checked. The gap in the IRM should be larger.
- The height of the OMMT1 will be changed from 21cm to 20cm.
- Small Type-C suspensions with mini-GAS.
R&D
Discussion
Next meeting
- 2025/9/26 10:00-