⇤ ← Revision 1 as of 2025-10-09 16:10:30
Size: 1261
Comment:
|
Size: 1207
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 18: | Line 18: |
| * Hirata-san assembled the delivered parts. Installation into the SRM chamber was scheduled in March 9-19. | * Hirata-san assembled the delivered parts. Installation into the SRM chamber was scheduled on March 9-19. |
| Line 28: | Line 28: |
| * It is necessary to adjust the tilt of the table with FRs. The space to embed the FR is considered ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=16918|estimation]]). | * It is necessary to adjust the tilt of the table with FRs. Sato-san checked the space to embed the FRs ([[attachment:SpaceForFR.pdf|report]]). |
| Line 36: | Line 36: |
| * 2025/10/10 10:00- | * 2025/10/24 10:00- |
Contents
VIS Meeting
Date: 2025/10/10 10:00-
Participants:
Topics
Type-A
- ACCs for the IP controls.
Evaluating the FLDACC with DGS in ATC (report). Noise budget was made.
Type-B/Bp
- IRM damper for Type-B.
- Hirata-san assembled the delivered parts. Installation into the SRM chamber was scheduled on March 9-19.
- Enclosure for the SG card in an independent box.
The prototype box was mounted in a 1U rack.
- IP for Type-Bp.
- Started a design.
Type-C
- Active isolation table for OMC.
- Small Type-C suspensions with mini-GAS.
R&D
Discussion
Next meeting
- 2025/10/24 10:00-