Differences between revisions 1 and 3 (spanning 2 versions)
Revision 1 as of 2025-10-09 16:10:30
Size: 1261
Comment:
Revision 3 as of 2025-10-10 10:47:49
Size: 1252
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
Date: 2025/10/10 10:00- Date: 2025/10/10 10:00-10:45
Line 9: Line 9:
Participants: Participants: Ushiba, Akutsu, Sato, Washimi, Takahashi
Line 18: Line 18:
  * Hirata-san assembled the delivered parts. Installation into the SRM chamber was scheduled in March 9-19.   * Hirata-san assembled the delivered parts. Installation into the SRM chamber was scheduled on March 9-19.
Line 28: Line 28:
  * It is necessary to adjust the tilt of the table with FRs. The space to embed the FR is considered ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=16918|estimation]]).   * It is necessary to adjust the tilt of the table with FRs. Sato-san checked the space to embed the FRs ([[attachment:SpaceForFR.pdf|report]]).
Line 36: Line 36:
 * 2025/10/10 10:00-  * 2025/10/24 10:00-


VIS Meeting

Date: 2025/10/10 10:00-10:45

Zoom

Participants: Ushiba, Akutsu, Sato, Washimi, Takahashi

Topics

Type-A

  • ACCs for the IP controls.
    • Evaluating the FLDACC with DGS in ATC (report). Noise budget was made.

Type-B/Bp

  • IRM damper for Type-B.
    • Hirata-san assembled the delivered parts. Installation into the SRM chamber was scheduled on March 9-19.
  • Enclosure for the SG card in an independent box.
    • The prototype box was mounted in a 1U rack.

  • IP for Type-Bp.
    • Started a design.

Type-C

  • Active isolation table for OMC.
    • New geophone (SM-700C) was delivered and evaluated (report).

    • The new geophone pod has been ordered.
    • It is necessary to adjust the tilt of the table with FRs. Sato-san checked the space to embed the FRs (report).

  • Small Type-C suspensions with mini-GAS.

R&D

Discussion

Next meeting

  • 2025/10/24 10:00-

KAGRA/Subgroups/VIS/VISMinutes20251010 (last edited 2025-10-10 10:47:49 by RyutaroTakahashi)