⇤ ← Revision 1 as of 2025-11-06 09:30:20
Size: 808
Comment:
|
Size: 853
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 15: | Line 15: |
| * Preparing for three ACCs for the SRM. | * Preparing for three ACCs for the SRM ([[attachment:PreAssembly.jpg|preassembly]]). |
Contents
VIS Meeting
Date: 2025/11/07 10:00-
Participants:
Topics
Type-A
- ACCs for the IP controls.
- Evaluating the FLDACC with DGS in ATC.
Preparing for three ACCs for the SRM (preassembly).
Type-B/Bp
- IRM damper for Type-B.
- In-vacuum cables have been made.
- Enclosure for the SG card in an independent box.
- Preparing for the boxes with a 1U rack panel.
- IP for Type-Bp.
- Started a design.
Type-C
- Active isolation table for OMC.
- The new geophone pod has been delivered.
- Sato-san is checking the coupling due to the blade springs.
- Small Type-C suspensions with mini-GAS.
R&D
Discussion
Next meeting
- 2025/11/21 10:00-