VIS Meeting
Date: 2025/11/07 10:00-
Participants:
Topics
Type-A
- ACCs for the IP controls.
- Evaluating the FLDACC with DGS in ATC.
Preparing for three ACCs (preassembly).
Type-B/Bp
- IRM damper for Type-B.
- Installation in SRM is scheduled on 3/9-19.
- Enclosure for the SG card in an independent box.
- Preparing for the boxes with a 1U rack panel.
- IP for Type-Bp.
- Started a design.
Type-C
- Active isolation table for OMC.
- The new geophone pod has been delivered.
- Sato-san is checking the coupling due to the blade springs.
- Small Type-C suspensions with mini-GAS.
R&D
Discussion
Next meeting
- 2025/11/21 10:00-