<> ---------- = VIS Meeting = Date: 2025/11/07 10:00-10:20 [[https://zoom.us/j/203743987|Zoom]] Participants: Aso, Ushiba, Sato, Akutsu, Yokozawa, Takahashi == Topics == === Type-A === * ACCs for the IP controls. * Evaluating the FLDACC with DGS in ATC. * Preparing for three ACCs ([[attachment:PreAssembly.jpg|preassembly]]). === Type-B/Bp === * IRM damper for Type-B. * Installation in SRM is scheduled on 3/9-19. * Enclosure for the SG card in an independent box. * Preparing for the boxes with a 1U rack panel. * IP for Type-Bp. * Started a design. === Type-C === * Active isolation table for OMC. * The new geophone pod has been delivered. A leak test should be performed. * Sato-san is checking the coupling due to the blade springs. * Small Type-C suspensions with mini-GAS. === R&D === == Discussion == == Next meeting == * 2025/11/21 10:00-