Differences between revisions 11 and 12
Revision 11 as of 2025-11-21 10:57:46
Size: 1358
Comment:
Revision 12 as of 2025-11-21 10:57:59
Size: 1357
Comment:
Deletions are marked like this. Additions are marked like this.
Line 32: Line 32:
  * The effect due to the evacuation of the TMS chamber was small (<20um). The effect due to the temperature change was largeer.   * The effect due to the evacuation of the TMS chamber was small (<20um). The effect due to the temperature change was larger.


VIS Meeting

Date: 2025/11/21 10:00-10:45

Zoom

Participants: Sato, Akutsu, Aso, Takahashi

Topics

Type-A

  • Oscillation of ITMX.
    • ITMX had a large oscillation around 1Hz due to the rubbing of the F3 keystone. The setpoints of F1 and F3 were changed (klog).

  • Height adjustment
    • Warming up will start on Dec. 8.
  • ACCs for the IP controls.
    • TF measurements of the folded pendulum are planned.
    • Preparing for three ACCs.

Type-B/Bp

  • IRM damper for Type-B.
    • Installation in SRM is scheduled on 3/9-19.
  • Enclosure for the SG card in an independent box.
    • Preparing for the boxes with a 1U rack panel.
  • IP for Type-Bp.
    • Started a design.

Type-C

  • Active isolation table for OMC.
    • The new geophone pod is assembled. A leak test should be performed.
    • The effect due to the evacuation of the TMS chamber was small (<20um). The effect due to the temperature change was larger.

    • Sato-san is designing the fishing rod (FR). FRs will be useful for the initial adjustment.
  • Small Type-C suspensions with mini-GAS.

R&D

Discussion

  • The modification of the Type-A tower toward O6.

Next meeting

  • 2025/12/5 10:00-

KAGRA/Subgroups/VIS/VISMinutes20251121 (last edited 2025-11-21 10:57:59 by RyutaroTakahashi)