VIS Meeting

Date: 2025/11/21 10:00-

Zoom

Participants:

Topics

Type-A

  • Oscillation of ITMX.
    • ITMX had a large oscillation around 1Hz due to the rubbing of the F3 keystone. The setpoints of F1 and F3 were changed (klog).

  • ACCs for the IP controls.
    • Evaluating the FLDACC with DGS in ATC.
    • Preparing for three ACCs.

Type-B/Bp

  • IRM damper for Type-B.
    • Installation in SRM is scheduled on 3/9-19.
  • Enclosure for the SG card in an independent box.
    • Preparing for the boxes with a 1U rack panel.
  • IP for Type-Bp.
    • Started a design.

Type-C

  • Active isolation table for OMC.
    • The new geophone pod is assembled. A leak test should be performed.
    • Sato-san is designing the fishing rod.
  • Small Type-C suspensions with mini-GAS.

R&D

Discussion

Next meeting

  • 2025/12/5 10:00-

KAGRA/Subgroups/VIS/VISMinutes20251121 (last edited 2025-11-21 10:57:59 by RyutaroTakahashi)