Date: 2025/12/05 10:00- Date: 2025/12/05 10:10-10:25
Line 9: Line 9:
Participants: Participants: Akutsu, Aso, Washimi, Ushiba, Takahashi
Line 21: Line 21:
  * Installation in SRM is scheduled on 3/9-19.   * Installation in SRM is scheduled on 3/9-19. A detailed schedule should be made.


VIS Meeting

Date: 2025/12/05 10:10-10:25

Zoom

Participants: Akutsu, Aso, Washimi, Ushiba, Takahashi

Topics

Type-A

  • Height adjustment
    • Warming up will start on Dec. 8.
  • ACCs for the IP controls.
    • TF measurements of the folded pendulum are planned.
    • Preparing for three ACCs.

Type-B/Bp

  • IRM damper for Type-B.
    • Installation in SRM is scheduled on 3/9-19. A detailed schedule should be made.
  • Enclosure for the SG card in an independent box.
    • Preparing for the boxes with a 1U rack panel.
  • IP for Type-Bp.
    • Started a design.

Type-C

  • Active isolation table for OMC.
    • The new geophone pod is assembled. A leak test should be performed.
    • The effect due to the evacuation of the TMS chamber was small (<20um). The effect due to the temperature change was larger.

    • Sato-san is designing the fishing rod (FR). FRs will be useful for the initial adjustment.
  • Small Type-C suspensions with mini-GAS.

R&D

Discussion

  • The modification of the Type-A tower toward O6.

Next meeting

  • 2026/1/16 10:00-