<> ---------- = VIS Meeting = Date: 2026/2/13 10:00-10:50 [[https://zoom.us/j/203743987|Zoom]] Participants: Fabian, Akutsu, Sato, Hirata, Washimi == Topics == === Type-A === * Oplev * Check the amount of light during the power outage. * ACCs for the IP controls. * TF measurements of the folded pendulum are necessary. === Type-B/Bp === * Installation in SRM * The detailed schedule is [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=17138|here]]. * Mirror replacement: The mirror holder was checked ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=36327|klog]]). New mirror and Fast contact are in Aso-san's office. * IRM damper: The assembled parts have been delivered to Kamioka. * FLDACC: The folded pendulums have been [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=17151|tuned]]. The assembled ACCs have been shipped to Kamioka. * SG card box. * Preparing for the boxes with a 1U rack panel. * IP for Type-Bp. * Started a design. === Type-C === * Active isolation table for OMC. * Sato-san started prototyping of the maraging blades. * Small Type-C suspensions with mini-GAS. === R&D === * Fabian is making a Python version of Sumcom. * The modification of the Type-A tower toward O6. == Discussion == == Next meeting == * 2026/2/27 10:00-