|
Size: 1403
Comment:
|
← Revision 4 as of 2026-02-27 11:15:07 ⇥
Size: 1450
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 5: | Line 5: |
| Date: 2026/2/27 11:00- | Date: 2026/2/27 11:00-11:15 |
| Line 9: | Line 9: |
| Participants: | Participants: Takahashi, Washimi, Sato, Akutsu, Yokozawa |
Contents
VIS Meeting
Date: 2026/2/27 11:00-11:15
Participants: Takahashi, Washimi, Sato, Akutsu, Yokozawa
Topics
Type-A
- Oplev
- Check the amount of light during the power outage.
- ACCs for the IP controls.
- TF measurements of the folded pendulum are necessary.
Type-B/Bp
- Installation in SRM
- SG card box.
- One box was installed in the SRM rack.
- IP for Type-Bp.
- Started a design.
Type-C
- Active isolation table for OMC.
- The prototype of the maraging blades is under manufacturing.
- Small Type-C suspensions with mini-GAS.
R&D
- Python version of Sumcom by Fabian.
- Modification of the Type-A tower toward O6.
Discussion
Next meeting
- 2026/3/27 10:00-
