7281
Comment:
|
8244
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
||'''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/vis|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] || |
|
Line 8: | Line 5: |
. Chief: R. Takahashi(ICRR) . Member: T. Uchiyama(ICRR), R. De''''''Salvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR) |
. Chief: R. Takahashi (NAOJ) . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ), T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF) ---- == NAOJ VI Meeting == . Every Wednesday, from 15:00 (JST) . [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]] ---- == Design == [[KAGRA/Subgroups/VIS/TypeA|Type-A]] Type-B [[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]] Type-C [[KAGRA/Subgroups/VIS/Payload|Payload]] iKAGRA TM ---- == Installation == . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]] ---- == Operation == . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]] |
Line 13: | Line 41: |
. Every Wednesday, 21:00(JST) | . This meeting is suspended. === The 31th (12 September, 2012) === . [[attachment:KAGRAvi_minute_2012Sep12.txt|Minute]] === The 30th (5 September, 2012) === . [[attachment:KAGRAvi_minute_2012Sep05.txt|Minute]] === The 29th (29 August, 2012) === . [[attachment:KAGRAvi_minute_2012Aug29.txt|Minute]] === The 28th (22 August, 2012) === . [[attachment:KAGRAvi_minute_2012Aug22.txt|Minute]] === The 27th (15 August, 2012) === . No meeting (summer vacation) === The 26th (8 August, 2012) === . [[attachment:KAGRAvi_minute_2012Aug08.txt|Minute]] === The 25th (1 August, 2012) === . [[attachment:KAGRAvi_minute_2012Aug01.txt|Minute]] |
Line 27: | Line 76: |
Line 29: | Line 77: |
Line 31: | Line 78: |
Line 36: | Line 82: |
Line 51: | Line 96: |
Line 59: | Line 103: |
Line 134: | Line 177: |
Line 138: | Line 180: |
. [[LCGT/subgroup/vis/tama_sas|Item list to be improved]] | . [[KAGRA/Subgroups/VIS/FEM/tama_sas|Item list to be improved]] |
Line 153: | Line 195: |
. [[LCGT/subgroup/vis/FEM|FEM Page]] | . [[KAGRA/Subgroups/VIS/FEM|FEM Page]] |
Line 156: | Line 198: |
. [[LCGT/subgroup/vis/Simulation|Simulation Page]] | . [[KAGRA/Subgroups/VIS/Simulation|Simulation Page]] |
Contents
- Vibration Isolation
- NAOJ VI Meeting
- Design
- Installation
- Operation
-
Weekly EVO Meeting
- The 31th (12 September, 2012)
- The 30th (5 September, 2012)
- The 29th (29 August, 2012)
- The 28th (22 August, 2012)
- The 27th (15 August, 2012)
- The 26th (8 August, 2012)
- The 25th (1 August, 2012)
- The 24th (28 September, 2011)
- The 23th (15 September, 2011)
- The 22th (7 September, 2011)
- The 21th (31 August, 2011)
- The 20th (24 August, 2011)
- The 19th (10 August, 2011)
- The 18th (27 July, 2011)
- The 17th (20 July, 2011)
- The 16th (13 July, 2011)
- The 15th (6 July, 2011)
- The 14th (29 June, 2011)
- The 13th (22 June, 2011)
- The 12th (15 June, 2011)
- The 11th (8 June, 2011)
- The 10th (1 June, 2011)
- The 9th (25 May, 2011)
- The 8th (18 May, 2011)
- The 7th (11 May, 2011)
- The 6th (27 April, 2011)
- The 5th (20 April, 2011)
- (11 April, 2011)
- The 4th (6 April, 2011)
- The 3rd (30 March, 2011)
- The 2nd (23 March, 2011)
- The 1st (16 March, 2011)
- LCGT防振系作業部会(2009)
- Archive
Vibration Isolation
- Chief: R. Takahashi (NAOJ)
- Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),
T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)
NAOJ VI Meeting
- Every Wednesday, from 15:00 (JST)
Design
Type-B
Type-C
iKAGRA TM
Installation
Operation
Weekly EVO Meeting
- This meeting is suspended.
The 31th (12 September, 2012)
The 30th (5 September, 2012)
The 29th (29 August, 2012)
The 28th (22 August, 2012)
The 27th (15 August, 2012)
- No meeting (summer vacation)
The 26th (8 August, 2012)
The 25th (1 August, 2012)
The 24th (28 September, 2011)
The 23th (15 September, 2011)
The 22th (7 September, 2011)
The 21th (31 August, 2011)
The 20th (24 August, 2011)
The 19th (10 August, 2011)
The 18th (27 July, 2011)
The 17th (20 July, 2011)
The 16th (13 July, 2011)
The 15th (6 July, 2011)
The 14th (29 June, 2011)
The 13th (22 June, 2011)
The 12th (15 June, 2011)
The 11th (8 June, 2011)
The 10th (1 June, 2011)
The 9th (25 May, 2011)
The 8th (18 May, 2011)
The 7th (11 May, 2011)
The 6th (27 April, 2011)
The 5th (20 April, 2011)
(11 April, 2011)
The 4th (6 April, 2011)
The 3rd (30 March, 2011)
The 2nd (23 March, 2011)
The 1st (16 March, 2011)
LCGT防振系作業部会(2009)
第6回
- 11月12日(木) 15:00-16:30 天文台輪講室
第5回
10月15日(木) 13:00-14:30 天文台大会議室 (議事録)
ブレーンストーミング
第4回
9月3日(木) 15:00-16:30 天文台輪講室 (議事録)
第3回
8月6日(木) 15:00-16:30 天文台輪講室 (議事録)
第2回
7月16日(木) 15:00-16:30 天文台輪講室 (議事録)
第1回
6月3日(水) 17:00-19:00 天文台輪講室 (議事録)
R&Dについて (次回)
Archive
TAMA SAS
TAMA Double Pendulum
Seismic spectrum in Kamioka mine
In loud day (This data should be used as nominal ground motion in Kamioka)
LCGT-SAS model
Transfer function X0~X7/Xg (old)
Modeling M-file (2009/8/15)(2009/8/17)
Spectrum of displacement (2009/8/15)(2009/8/17)
Finite Element Analysis